The best Side of validation protocol for equipment
4. Any deviation or adjust from this technique really should be documented and investigated. five. There has to be a prepared course of action or system for servicing of equipment part needs to be described in the protocol.The error detection plan is assumed to be flawless (not a realistic assumption, but certainly a realistic根据 cGMP 的要求